McDowell Nature Preserve Site Renovations

Mecklenburg County, NC

 

The scope of the project was to make repairs to the dilapidated asphalt roads, redesign the pier parking lot, and design stormwater features.  

 

( SCROLL FOR MORE )

 
 

 
P1010432.jpg

Project Components

• Repairs to asphalt roads
• Redesign pier parking lot
• Design stormwater features

 

Project Overview

The scope of the project was to make repairs to the dilapidated asphalt roads, redesign the pier parking lot, and design stormwater features.  

The repair of the asphalt consisted of undercutting areas where the sub-base was failing and the overlying portions that were in acceptable shape.  The asphalt, stormwater controls, standing curb, and the turning radius of the pier parking lot no longer functioned as intended. We were able to fill the cracks and seal coat some of the asphalt.

The project was performed in 4 phases with a total cost of approximately $900,000.

 
View fullsize IMG_1042.JPG
View fullsize IMG_1758.JPG
View fullsize IMG_1047.JPG
View fullsize P1020717.jpg
View fullsize P1020713.jpg
View fullsize P1020018.jpg
View fullsize P1020841.jpg
View fullsize P1020022.jpg
View fullsize P1020024.jpg
 
 

project challenges

The asphalt, stormwater controls, standing curb, and the turning radius of the pier parking lot no longer functioned as intended.


success highlights

We were able to fill the cracks and seal coat some of the asphalt to help minimize the total cost of the project. The parking lot was redesigned to be more functional and accommodated the current needs.


 
 
NEXT
Featured Project Header
Featured Project Divider
Featured Project Info

About UsFocus AreasFeatured ProjectsTerms & Policies
logo-footer.png

704-282-0826 • 1001 LANCASTER AVENUE MONROE, NC 28112

contact us